Études de cas

R1D Indonesia

COMPOSITE PREPREG SOLUTION FOR COATED PIPE PROTECTION & REINFORCEMENT DEFECT TYPE External corrosion DETAILS 11 points of corrosion, 8inch buried gas pipe, 40bars pressure, max operating temp. 35°C LOCATION Pertamina Gas Sumatra, Indonesia OVERVIEW The objective of the repairs, carried out by 3X ENGINEERING (3X) local distributor SINCERITY ENERGY, was to reinforce 11 areas of […]

R1D Indonesia Lire la suite »

R4D Middle-East

HIGH-PERFORMANCE COMPOSITE REPAIR SOLUTION FOR PIPE REINFORCEMENT DEFECT TYPE Severe external corrosion spots & leaking defect DETAILS PIPE DETAILS: 20” Gas pipeline – max. operating temp. 60°C – design pressure 172 bars LOCATION MIDDLE EAST 3X PRODUCT REINFORCEKiT 4D (R4D) OVERVIEW The objective of the repair performed by 3X ENGINEERING and its local exclusive distributor

R4D Middle-East Lire la suite »

Panier