The objective of the repair, carried out in June 2022 by 3X ENGINEERING (3X) local distributor was to reinforce 3 different lines transporting oil (located in Offshore platform) and suffering from external corrosion ==> sweepolet, 6" riser and 12" bended pipe. To restore their integrity and prevent further deterioration, it was decided to repair the defected areas using 3X composite repair solution REINFORCEKIT® 4D (R4D).

Results

Samples of resin were taken during each tape impregnation for quality control. Hardness measurements were performed 3 days after job completion and concluded the good achievement of these repairs using REINFORCEKIT® 4D product. Lifetime design for sweepolet and 12" bended pipe is 10 years and 20 years for the 6" riser.

Defect type
External corrosion (3 defects)
Details
Sweepolet (35°C, 9 bars); 6" riser (95°C, 220 bars); 12" bended pipe (70°C, 19 bars)
Location
Middle-East
3X Product type
REINFORCEKiT® 4D

SCOPE OF WORK


According to ASME PCC-2 standard and 3X calculations, it was decided to apply R4D using R3X95 resin (specially used for repairing pipe operating up to 95°C). Four layers of composite were determined to reinforce each defected area. Surface preparation was completed using Bristle Blaster machine to get a good surface roughness (superior to 60µm Rz) and ensure a good bonding between the steel pipe and the composite repair system. Then hygrometric conditions were checked and the surface was degreased with acetone.

The composite repair was then completed following 4 main stages, as below:

  1. F3X8 filler was applied on the defected areas to smooth the shape (this step was not necessary for 6" riser reinforcement).
  2. One layer of R3X95 resin was then applied on the defected area to protect the surface from corrosion and ensure a good wetting of the composite wrapping with the steel pipe.
  3. Composite wrapping was completed using Kevlar® tape impregnated with R3X95 resin ==> 4 layers were installed for a total repair length of 120mm for sweepolet repair, 1300mm for riser repair and 402mm for bended pipe repair.
  4. Last layer of R3X95 resin was applied all over the repairs as finishing stage and id plate was installed over each reinforcement for traceability.